A Michigan university research facility in Ann Arbor trusted us with their building envelope. We didn't take that lightly.
Multi-floor, multi-scope air and vapor barrier installation on a complex structure — masonry, metal panel, soffit, parapet, and bridge conditions all in play.
Booms and swing stages for aerial access. Detail-heavy work throughout — brackets, steel connections, and transitions at every level. The kind of job where shortcuts show up later. We don't take shortcuts.
Over 2,100 hours. 264 mandays. WR Meadows material throughout.
The building envelope only works if every transition, every termination, every detail is done right. That's the job. That's what we showed up to do.
Handled Safely. On Schedule. Done Right.